personal service global reach/integral control systems services
  • Equipment Sales
  • Keep Your Current System
  • NETWORK 90, INFI 90, HARMONY Components
  • On-site Support
  • Equipment Supported
  • Troubleshooting & Field Repair
  • Start-Up
  • Calibration & PM
  • Combustion Testing
  • System Tuning
  • Plant Outage
  • System Engineering
  • Application Engineering
  • Project Documentation
  • Example Drawings
  • Training
  • Courses Offered
  • Sample Course
  • Proposal Request
  • Equipment Survey
  • Module Repair Center
  • Equipment Repair Process Terms
  • Get RMA Form
  • Home
  • Our Commitment
  • Equipment Sales
  • On-Site Support Services
  • Installation Support
  • Upgrade Audit
  • Preventative Maintenance
  • System Engineering
  • Project Documentation
  • Training
  • Technical Support
  • MRO Support
  • Module Repair Center
  • Systems Integrator FAQ
  • Bailey CLC-SLC Upgrade
Network 90, INFI 90 and Harmony nomenclature glossary
Get an RMA Number

Why ICSS?

ICSS can give you peace of mind today, and a commitment to your ongoing satisfaction and future success.

Process Control Terms

Glossary » Process Control Terms

Basic Station

BATRAM (NVRAM)

Bypass Operation

Cascade Station

Closed Loop

CONFIGURATION

CONFIGURE

Control Output

CONTROLWAY

EEROM

EXCEPTION REPORT

FUNCTION BLOCK

FUNCTION CODE BLOCK ADDRESS (OR BLOCK NUMBER)

FUNCTION CODE

MODULATING CONTROL

NODE

Open Loop

PCU (PROCESS CONTROL UNIT)

Process Variable

PROM

Ratio Station

SEQUENTIAL CONTROL

Set Point

SLAVE EXPANDER BUS

SPECIFICATION

TAG

UART

Wild Variable

ICSS, Inc. · 1303 Sackett Ave. · Cuyahoga Falls, Ohio 44223 USA · (330) 923-6900 · (330) 923-2116 Fax
Site Map :: Terms of Use :: Employment Opportunities :: Contact ICSS :: About This Site
©2004-2006, ICSS, Inc.